Wednesday, April 10, 2013

The start of a new project

We have gone and made something of a giant mess of the master bathroom. Actually, to be perfectly accurate (something I've never really concerned myself overmuch with before, but it's a new year), the mess is now all over the garage floor, but moving it from one part of the house to another doesn't magically eliminate it - much to our chagrin.

The holes in the wall and the great gaping absence where the tub used to be, on the other hand, are much more difficult to move from one location to another and are thus pretty much right where we left them. In the wall. Or, on the floor.

Man, I'm two paragraphs into this post and and I'm already boring myself to tears. How about we just get to the pictures, eh?

I'm not feeling particularly ... wordsome tonight, so I think I'll just let the pictures speak for themselves. Hopefully this post will get me back in the swing and maybe next time I'll have stories and other awesome happenings to relate but right now... meh, I'm just tired.

In case you've forgotten, here's the master bath before we started ripping it apart (except for that patch I cut away to find out whether the floor went all the way to the wall):


 START THE DEMOLITIONSES!


That was... harder than it seems, actually.  The tiles that were left on the ledge thing seemed to have been installed professionally, and the ones on the wall were actually glued to the drywall (so, NOT professionally). I wound up just cutting at the drywall seams and yanking the pieces of wall right off with the tiles still attached.

Once I got the shelf off, I found that the plumbing was also less than optimal. Here's me in my oh-so-fashionable do-rag pointing out the shelf that ran under the copper pipe that fed the shower head, which in turn ran right underneath the tiled plywood shelf:


Kind of amazed that there weren't any leaks, what with all the screws and nails in the immediate vicinity.

Of course, the tub wasn't coming out without a fight either, but that is, after all, exactly why I own a reciprocating saw:


Hee hee hee. Tub never saw it coming. Get it? Saw it coming?

Shut up.

Anyway, to cut a long series of demolition and cleaning short, here's what the bathroom looked like with the mess cleared away, a quick-and-dirty protective box built around the plumbing shut-offs, and a couple of scrap pieces of lumber tacked up over the holes to keep the damn cats out of the soffits (there's a little roof outside there that'll show up when I get around to taking some outside shots):


And that's pretty much exactly how it stayed for two months. Out trusty contractor, Mike, was supposed to come and install a new window, but the assholes we ordered the window from couldn't be arsed to make it for us.

Until this morning, that is.

Ta-da! New window!


Now come the hard parts... tiling, drywalling, plumbing, wrestling a four-hundred pound tub up the stairs, painting, etc.

Stay tuned!

Sunday, January 6, 2013

Happy New Year!

Well, here we are at the beginning of another year, and boy howdy, I hope the first few days of your new year are a hell of a lot better than ours so far. The War Department came down with a nasty case of the flu pretty much the instant we stepped off the germ tube coming back from Christmas with the Top Brass, and she hasn't even managed to go back to work yet. Couple that with the realization that our kitchen and dining room floor was pretty badly dinged up by some unfortunately pointy high heels at our New Years' Eve party, and it hasn't been a stellar start to the year.

But it is a new year, and with that comes my annual resolution to post more. In the interests of fairness, I should probably also mention that my OTHER new years resolution is to stop taking sugar in my coffee, and 2013 will be the ninth year in a row I've made that one. Don't get your hopes up TOO much, is what I'm saying.

Anyway, to try and start off the new year right, and to cheer Amy up after we noticed the dents in our floor, I got started with some much needed exploratory surgery on this year's major project: the master bedroom ensuite. Or, as my friend insists on calling it (rightly so): the Ba'ath Bath.

Before we could even draw up a plan or start to think about the budget for this project, we had to find out exactly what we were dealing with. You see, there's a rather large shelf jutting out from the back wall of the bathroom. I'm pretty sure this was installed because they weren't using a free-standing tub (and the strange little jut out in the wall on the one side would confirm this). We, of course, really wanted to install a clawfoot tub in there and without knowing what was under the shelf, we didn't know if the clawfoot would fit.

So with the War Department supervising from a distance (stupid flu), I grabbed a few tools and whatnot, and prepared to figure out what was under the shelf.

Oh, I should also probably mention at this point that the gold taps that make the bath ... uh, well, that make it Ba'ath, if you know what I mean, weren't original to the house. They were installed well afterwards by none other than Frank himself - or his handyman. And yes, we're pretty sure it was him. Why? Oh, you'll like this, I promise you.

So here's a shot of the shower from way back that shows what I mean about the shelf jutting out:


One of the first things we'll need to do is replace the windows, and unless the wall underneath the windows goes all the way to the floor, there's no way we're getting a clawfoot in there, and we'll have to replace the windows with something that can handle being part of a shower stall. (Sort of like what those windows SHOULD have been in the first place, but  the house was built in the 80s and hey - life was simpler then. More neon, sure, but simpler.)

Anyway, if you look closely at that picture, you can see the shelf, the taps, and the obviously different tiles they used to cover up the hole they had to make when they hooked up the new taps. Think about that for a minute though: Frank wanted these taps SO badly, he was so convinced that they'd dress up his bathroom so much, that he was willing to put in any old crappy ass tiles he had lying around to fix the hole he'd have to make. I just... gah. Oh, and keep in mind that there's also a huge, obvious patch in the family room ceiling where they had to cut a hole to access the drain and put in the matching tub plug.

Anyway, I grabbed a hammer and cold chisel (because I didn't have a grout blade for my hand-held flush cutter), and popped off the four mis-matched tiles. Naturally, they came off pretty easy because who ever installed them didn't actually use grout between the tiles. After all, why would they, when they can use....

This Week In Mayonnaise
Just when I think I've seen every possible use for the stuff, I get this:


I don't even...

Man, that's like a clinic on how NOT to tile, isn't it? Mis-matched tiles (seriously, not even TRYING to make those close - the only thing they have in common with the existing ones is the size), mayonnaise instead of grout, grey thinset under white tiles, no back-buttering, not enough water in the mix... man, I could tile better than that, and I've only done it twice.

Anyway, ten minutes with the drill (seven of which was going back downstairs twice for an extra battery and then a different drill) got the plywood patch off, and we could see underneath the shelf:


Inside the hole... well, it's hard to see, but it's actually good news:


That's good, solid subfloor, all the way to the wall. Looks like we'll be getting our clawfoot! Mind you, that's many months down the road, and so to keep the cats and their mistress happy, I fixed up a plywood patch to go over the hole:


Now the War Department can have her baths, and the kitties can sit on the ledges and drink the bath water she deigns to dribble on the sides of the tub for them.





Well, what did you THINK she did with it? If we're going to have a bath fit for the Queen of Sheba, she's going to damn well act like it!



Wednesday, December 5, 2012

The arbor

So we bought this arbor from Lee Valley. Like, ages ago. And when I say ages ago, I mean AGES ago. Pretty sure the box was already sitting in our garage back when we tried fixing the stove. So, yeah, it's been around a long time. But hey - it's a nice arbor, we got it for a good price, and if it happens to sit around in the garage (or outside under the eaves, for that matter) for a ... year or two, well, we'll get around to it eventually, right?

After all, there's a brand new toilet in our storage space that we've had for almost THREE years, still in its box and everything. I shouldn't mention that, though, or the War Department will make me install it somewhere. Knowing that it's waiting in reserve is probably the only thing keeping the toilet from hell working at all.

Where was I? Right. The arbor.

Anyway, the reason we bought this arbor is because the old one that Frank left behind was completely rusted through in several places and only being held up by the wysteria growing up the side of it. There were actually two of the damn things, but one of them got ripped out during our aborted attempt at putting up the resin shed. Which, come to think of it, means that both of these arbors were involved in us buying something and then storing it in the garage for an extended period before actually erecting it. You know, I'm just not going to dwell on that right now. Or, probably, ever. This post is already depressing me and I haven't even started telling you about what a pain in the ass it was to actually install. Because you know that's coming next, right?

Cause if you don't, well, it's probably my fault for not updating the blog enough.

What the hell was this supposed to be about again? Jebus, but I'm bad at this.

Okay, so, the arbor. This thing:



Maybe, at some distant point in the Pleistocene or something, that might have been a good-looking arbor. Cast iron (mostly), nice detail, not too ornate.

Oh, who am I kidding? Crappy Tire special all the way.

Anyway, like I said, it was pretty thoroughly rotten - as this close-up will no doubt help illustrate: 



(That's a handy picture to include for other reasons, too, actually, as it shows precisely the main function of the arbor: to hold up the hummingbird feeder. The light on the side? Oh, that's to keep the feeder from freezing in the winter. Keep that in mind as you read this post: all of the effort described herein was solely for the benefit of the hummingbirds in the backyard. Hummingbirds. The biggest assholes in the avian kingdom.)

The good news about it being rotten is that taking it out was EASY. I just sort of yanked on it, and the half-inch of concrete it was sent into levered right up in one big chunk. Well, until it split neatly in half, of course, but that just made it easier to break up and fit into the wheelbarrow. Took longer to drive the scrap metal up to the recycling center than it did to take out the arbor, actually. Yep. Easy.

So... easy.

Sigh. Should have seen the rest of this project coming, I really should.

So, the new arbor was slightly different in design than the old one in that it was designed with legs about 18 inches too long for the arbor. This is because you're supposed to dig a hole for each post, and then set the posts in concrete. Of course, we kind of wanted a pad underneath (seeing as how the old one came up with the old arbor and it was a piece of shit anyway), so we figured we'd just dig out a big old hole at the base of the stairs there, set the legs into concrete, and then pour a nice slab across the top.

Problem One: bedrock. So, it seems like there's a reason for all the terraced levels and the steps in the backyard. It's because there's a bloody great rock underneath all the weeds. And this rock is right underneath the steps. And comes out from the steps underneath the lawn a little ways.

Which is a round-about and not very clear way of saying that there was no way to dig the hole deep enough without coming way out into the lawn. The front legs would have been fine, but the back legs would have been about four inches long, and propped on bedrock.

Well, I REALLY didn't want to start cutting the legs to different lengths, so we decided to just fill in the hole, pour a nice pad, and then cut the legs off the arbor and attach it to the pad.

Which we did. Well, the first bit, anyway. We filled in the hole, built a nice form from some spare scraps of two-by-four, got a few bags of concrete, mixed them up in the wheelbarrow, and poured a nice little pad at the base of the stairs. Then I measured up the legs all careful like, and cut them off with my trusty(-ish) hacksaw.

Then we realized that the concrete had to cure for at least 28 days before we started drilling into it with TapCons. Which meant propping the arbor up on the lawn for a month. (Couldn't put it back in the garage - how will we hang a hummingbird feeder from it in there?) So, that sucked. But, as it turned out, we needed those four weeks to figure out how the hell to attach four hollow metal legs to a flat concrete slab in a way that didn't leave the hardware exposed to the same weather that had already caused two metal arbors to rot.

I... can't even really describe the things we thought of using. L-brackets, fence hardware, hand-carved wooden blocks (I might have had a few beers when I thought that one up, I'm just saying) - hell, at once point I was convinced the best way to do it would be to start over. Or maybe just put it back in the box in the garage. It was happy there, I could tell. It didn't speak to me in that mocking whisper in the quiet moments just before the dawn...

Anyway, we wound up paying an extra $40 for a metal working shop up near Amy's work to make us some custom brackets out of scrap aluminum. Then, during a brief break in the incessant November rains, I got out there with a hammer drill and my LEAST FAVORITE FASTENERS IN THE WORLD, a box of TapCons, and I installed the brackets in the pad:






Which went about as well as could be expected for TapCons, and by that I mean I only broke one bit off in the hole, and only snapped the head off of one TapCon (which meant I had to drill a new hole in the bracket, which also meant I wound up installing the bracket at the wrong damn angle so the metal screw that attaches the bracket to the arbor is going into the metal on a different side than the other legs). I call that a roaring success.

Amazingly enough, the arbor went down over the brackets, and we now have a fully functioning hummingbird-feeder-hanging-device back up in the garden. 





The Injury Report 

 The project, of course, got its requisite amount of blood and swearing - I managed a nice little knuckle punch of the rock retaining wall when the drill bit snapped.



God damn it, I hate TapCons.







Sunday, June 24, 2012

Wrapping up some loose ends

So it turns out that the only time projects DON'T take about three times as long as we plan is when we pay someone else to do them for us.

Yeah.

Why do we do this again?

Anyway, looking back over my last post (wow, it's been a while, eh?), we had just finished the patio. To be fair, the amount of work we put into the patio has figured heavily in my lack of wanting to post anything here. Or at least, that'll be my chosen excuse. Hell, I don't even feel like writing this right now, but here we are...


Way back when, before we had even STARTED the patio, we had our old friend Mike over to give us a quote on replacing the window in the kitchen with a patio door. (Mike's the guy who installed our floors downstairs, and rebuilt the sunroom.) See, to get out onto our nice new patio, we had to go out through the family room and through the sunroom. Which, admittedly isn't exactly FAR, but feels like light years when I've let the barbecue flare up again, and I'm burning the chicken.

Mike had assured us that fitting a new door was just a day's work for him (hah!), and so we went ahead and ordered a nice, pre-hung set of French doors. While we were waiting on those to be ready, we dug out and built the patio, and then sat around for another couple of weeks... it really took a long time for it to be ready, I gotta say.

Not Mike's fault at all, but the door place was... well, not the sharpest tools in the shed, if you know what I mean. Anyway, the door eventually arrived, and Mike came over at about 8:30 one fine Thursday morning to stick it in. Just in case I haven't ever shared a picture of that particular window, here's what it looked like the day before:


And these are the pictures the War Department sent me at 10:30 that morning:



Oh, and of course, she also texted that the door didn't fit, but she was LYING. VERY NOT FUNNY, DEAR.

By the time I got home, well, there was nothing really left to do but go and buy a lockset because we'd forgotten to tell Mike which one we wanted. At his recommendation, we got one with a lever handle because, even though it doesn't match the style of our existing door handles, it's a lot easier when you've got an armload of chicken for the barbecue in one hand, and a nice cold bottle of beer in the other. Not that, you know, I'm EVER likely to be using the door under those exact conditions every weekend or something.

Fortunately, I've done enough knobs in my time (TWSS) that I'm getting pretty good at it and I can install one without having to do it twice:


So the next part of this particular project was to replace the baseboard heater that was in front of the window. Of course, now there was a big freaking door there, so we'd have to come up with another solution. Fortunately for us, they make electric heaters that, amazingly enough, hang on the wall! So we bought one! This being us, it was not as easy as that. See, original electric wire that fed the baseboard heater came out at the bottom of the wall - near, oddly enough, the baseboard. Hence the name? I dunno. Anyway, we had to cut out a piece of drywall, and pull the wire up through the cavity and then across the wall to the panel on the back side of our new heater:


Fortunately, this being the kitchen, and not exactly a finished space, we decided to just put the drywall back, and mount the heater in front of it. We'll get around to mudding over that when we redo the kitchen in, oh, say, five years? Sure, let's go with that.


And with that, the patio - and the sunroom! - is officially finished. We bought a nice little patio table and some chairs (the umbrella has to go back to the store and be exchanged - cheap-ass p.o.s.), and I built a couple of planter boxes for herbs and flowers.

Sunroom:



Patio:




Oh, well, of course, we still need to do some backfilling and seeding around the retaining wall, and there are a couple of decorative bits to put in, and I really want to put a hosereel on the side there, and the barbecue is pretty ugly...

I'll say one thing for our patio, though: it makes the rest of the back of our house look like shit. Man, somebody really ought to do something about that stucco...